Assessed value
$9,746,700
$4,526,100 bldg · $5,220,600 land
Acreage
339 ac
$28,751 / ac
Land use
2-1C
RR1/RR3
Year built
1940
55,150 sqft
Owner mailing
211 INDIAN MOUNTAIN RD LAKEVILLE, CT 06039
Building

- Style
- Schools/Colleg
- Year built
- 1940
- Living area
- 55,150 sqft · 2.0 stories
- Exterior
- clapboard
- Heat
- Forced Air-Duc · Oil
Recorded sales
Jan 1, 1901
— INDIAN MOUNTAIN SCHOOL INC
Bk/Pg 132 639/0
Planning & Zoning actions
- May 19, 2025#2025-0288
Site Plan Application for Conversion of Faculty Housing to Dormitory (Section 803.5)
New Business
- May 19, 2025#2023-0220
Reception and Consideration as Possible Minor Modification Engineer Todd Parsons of Haley Ward Engineering explained that Indian Mountain School is requesting a modification of a site plan approved in 2023 for changes to the assembly area. Luca Segato of VMA Architects presented the application. He explained that a portion of the project approved in 2023 has recently been completed, so the current application is regarding “phase 2B” (the renovation of the servery and the conversion of the assembly into a dining hall). Mr. Segato presented plans showing the details of phase 2B. Additionally, Mr. Segato pointed out the areas where the plans changed since they were initially approved in 2023. These changes included expanding the dining area and servery in place of previously planned classrooms, storage, and a counseling suite. Mr. Segato also noted that comments on the plans from the Building Office have been addressed, and Torrington Area Health District (TAHD) approval is pending.
Modification of Approved Site Plan for Servery and Dining Area (Section 800.4)
- Aug 21, 2023#2023-0223
Site Plan Modification to Establish New Ropes Challenge Course (Section 800)
Public Hearing
- Jul 17, 2023#2023-0220
Reception and Possible Consideration Engineer Todd Parsons oriented the Commissioners to the site plan map, and described it to the Commission. He pointed out two additions, a new sidewalk, a ramp, a patio, landscaping, entryways/exits, and a new stairway. He explained that the additions total 1,400 square feet, that there is no utility work planned, and no changes to parking. There will be only a small increase in impervious surface percentage, and little to no changes in stormwater drainage. All areas disturbed will be restored with turf. Alternate Schiffer asked if the application will need to first be approved by the Fire Marshal.
New Business
- Aug 15, 2022#2021-0136
Construction Update Todd Parsons of Lenard Engineering presented an update of construction at Indian Mountain School. This project was originally approved on March 21 st , 2021, and included a twenty-two thousand square foot field house, synthetic turf field, and adjustments to parking lots and sidewalks. An amendment to
Other Business
- Jun 21, 2021#2021-0136
Possible Consideration Engineer Todd Parsons was present for the application and briefly described the plans. He identified the application as a minor modification to one approved by the Commission earlier in the year. Proposed changes include minor construction details such as describing the dimensions of crushed stone to be used. A generator has been added and the geothermal well field expanded. The HVAC for the field house demanded more wells than originally anticipated. Mr. Parsons identified that the construction activities would be occurring hundreds of feet away from the nearest wetlands. The structure was expanded by a cumulative 800 square feet for two reasons. The structural engineers determined that a pre-engineered structural system would be more fiscally efficient to construct and the geothermal mechanicals required additional space. DEEP and TAHD have reviewed and approved of the modified plans.
Old Business
- Mar 15, 2021#2021-0122
Todd Parsons and Cheryl Sleboda came forward. Mr. Parsons explained that they have received IWC approval since the last meeting where this application was presented. The IWC required a meadow mix as a condition of approval. Chairman Klemens recused himself and Alternate Schiffer was seated for this vote.
Old Business
- Feb 8, 2021#2021-0122
Site Plan Approval to Construct a Field House and Artificial Turf Athletic Field
New Business
More on Indian Mountain Road
0 INDIAN MOUNTAIN ROAD
$7,000 · 1 ac
0 INDIAN MOUNTAIN ROAD
$4,560 · 37.2 ac
0 INDIAN MOUNTAIN ROAD
$102,140 · 14.16 ac
0 INDIAN MOUNTAIN ROAD
$6,620 · 54 ac
9 INDIAN MOUNTAIN ROAD
$172,200 · 0.32 ac · Built 1963
11 INDIAN MOUNTAIN ROAD
$171,900 · 0.29 ac · Built 1960
15 INDIAN MOUNTAIN ROAD
$205,700 · 0.49 ac · Built 1960
21 INDIAN MOUNTAIN ROAD
$237,700 · 0.68 ac · Built 1959