Assessed value
$315,800
$246,200 bldg · $69,600 land
Acreage
0.92 ac
$343,261 / ac
Land use
1-1
R20
Year built
1936
1,733 sqft
Owner mailing
Lakeville, CT
Building

- Style
- Ranch
- Year built
- 1936
- Living area
- 1,733 sqft · 1.0 story
- Exterior
- brick/stone
Site characteristics
- Wetlands
- 18% of parcel area
Recorded sales
Mar 13, 2012
— RAMCHARRAN TONEISHA & TROY
Bk/Pg 0235/0003
May 27, 1999
— EASTMAN RAE A
Bk/Pg 0173/0025
Planning & Zoning actions
- Nov 15, 2021#2021-0145
Special Permit for Vertical Expansion of a Nonconforming Dwelling in the Aquifer and Flood Plain Overlay Districts (Section 401, 403 & 503.2)
Brief Items and Announcements
- Oct 18, 2021#2021-0145
Special Permit for Vertical Expansion of a Nonconforming Dwelling in the Aquifer and Flood Plain Overlay Districts (Section 401, 403 & 503.2)
New Business
- Sep 20, 2021#2021-0145
Special Permit for Vertical Expansion of a Nonconforming Dwelling in the Aquifer and Flood Plain Overlay Districts (Section 401, 403 & 503.2)
Public Hearing and Possible Consideration
- Aug 16, 2021#2021-0145
DOR 08/16/2021 James Brucz of the LRC Group was present to explain the application. He identified that the existing dwelling is nonconforming with regard to setbacks to watercourses and the front property line. The Ramcharrans are proposing to construct a second story addition which requires a public hearing due to vertical expansion of the nonconforming structure. Mr. Brucz explained that the Zoning Board of Appeals approved a variance for the front yard setback and that they have an application pending with the Inland Wetlands and Watercourses Commission. Chairman Klemens asked about the proposed pavement encroaching on the sharedaccessway. Mr. Brucz responded that the homeowner has been in communication with the neighbors and that the abutting neighbors have provided letters in support of the improvements. Mr. Brucz clarified that the proposed deck is smaller than a deck that was destroyed in a storm due to poor construction. The new footings are proposed outside of the 100-year flood zone. Chairman Klemens inquired about the location of the air conditioning condensers, proposed generator and the 500-year flood elevation. Mr. Brucz explained that they had considered locating the mechanicals in a different location but due to the setbacks on the property, it could not be done. One possible solution would be to raise the elevation of concrete pad by a foot and a half.
New Business
More on Cleaveland Street
3 CLEAVELAND STREET
$261,300 · 0.88 ac · Built 1870
7 CLEAVELAND STREET
$198,100 · 0.4 ac · Built 1900
11 CLEAVELAND STREET
$112,000 · 0.41 ac · Built 1900
15 CLEAVELAND STREET
$251,800 · 1.19 ac · Built 1900
25 CLEAVELAND STREET
$258,500 · 3.04 ac · Built 1972
27 CLEAVELAND STREET
$426,400 · 27.29 ac · Built 1900
38 CLEAVELAND STREET
$234,600 · 1.27 ac · Built 1950
39 CLEAVELAND STREET
$207,700 · 1.65 ac · Built 1966